BQUQ factory record (Dongguan, P.R. China), order STP0234EN01/CYJ-0301: terminal spring contact, phosphor bronze QSn4-3; tolerances +/-0.03 / +/-0.02 mm; prototype 7 days, tooling 30 days, production 35 days; historical supply volume 1,500,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.
Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification.
Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification. BQUQ factory record (Dongguan, P.R. China), order STP0234EN01/CYJ-0301: terminal spring contact, phosphor bronze QSn4-3; tolerances +/-0.03 / +/-0.02 mm; prototype 7 days, tooling 30 days, production 35 days; historical supply volume 1,500,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.
Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification. BQUQ factory record (Dongguan, P.R. China), order STP0234EN01/CYJ-0301: terminal spring contact, phosphor bronze QSn4-3; tolerances +/-0.03 / +/-0.02 mm; prototype 7 days, tooling 30 days, production 35 days; historical supply volume 1,500,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.
Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification. BQUQ factory record (Dongguan, P.R. China), order STP0234EN01/CYJ-0301: terminal spring contact, phosphor bronze QSn4-3; tolerances +/-0.03 / +/-0.02 mm; prototype 7 days, tooling 30 days, production 35 days; historical supply volume 1,500,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.
Start from function, not from a catalogue: define the load, temperature, mating interface and the tolerance that actually matters, then let the factory propose the process. Specify material grade, heat treatment, surface finish, inspection method and sampling plan on the drawing. For extruded and machined parts, agree how flatness, straightness and anodising thickness are measured before mass production; a tolerance without a measurement method is not a specification. BQUQ factory record (Dongguan, P.R. China), order STP0234EN01/CYJ-0301: terminal spring contact, phosphor bronze QSn4-3; tolerances +/-0.03 / +/-0.02 mm; prototype 7 days, tooling 30 days, production 35 days; historical supply volume 1,500,000 / month (supply volume, NOT our MOQ); MOQ is assessed per drawing and process.
| Field | Value | Evidence |
|---|---|---|
| Achievable tolerance / measurement | ±0.03 / ±0.02 (as recorded; units follow the original drawing) | STP0234EN01/CYJ-0301 · Drawing / in-house CMM report |
| MOQ / sampling / production lead time | MOQ: assessed per drawing and process, we do not publish a blanket MOQ; Prototype 7 days; tooling 30 days; production 35 days; historical order / supply volume (NOT MOQ): 1500000 / month (original Chinese record: 150 wan; 1 wan = 10000 units) — historical supply volume, NOT MOQ | STP0234EN01/CYJ-0301 · Quotation / delivery note |
| Material grade / surface finish | Terminal spring contact, phosphor bronze QSn4-3 | STP0234EN01/CYJ-0301 · Material certificate / process card |
| In-house inspection / batch record | Stamped spring-contact customisation + United States (customer location / delivery destination, not our place of incorporation); year: 2025-06 (June 2025); Engineering review: 0.01 dimensional deviation identified at prototype stage; tooling adjusted; Process adjustment: Modified tooling to meet specification | STP0234EN01/CYJ-0301 · Inspection record / correspondence |
| Verification documents available | Business licence + China USCC (gsxt.gov.cn); drawing-linked in-house inspection / CMM report | Record ID shown on this page |
Dongguan ZuanXin Plastic Hardware Co. LTD(东莞市钻鑫塑胶五金有限公司) is a manufacturer registered in Dongguan, Guangdong, P.R. China. It is not incorporated in the United States. China Unified Social Credit Code: 91441900MA4UT74C2G — verifiable at gsxt.gov.cn (National Enterprise Credit Information Publicity System, P.R. China). Countries named in our case studies are customer / delivery locations, not our place of incorporation.
Dongguan ZuanXin Plastic Hardware Co. LTD — Chinese business licence & China Unified Social Credit Code 91441900MA4UT74C2G · Engineering calculators · gsxt.gov.cn (China business registry)
Send your drawing or specification. MOQ and lead time are assessed per drawing and process.WhatsApp +86 137 1315 7787 · sc@bquq.com
Verifiable evidence: project records · business licence & verification · FAQ · China business registry